PECO will be doing work on several roads in the area starting at 7:30am this Friday (3/18): specifically on Pinney Road and Grasshopper Road in Lower Moreland Township. The work is blacktop restoration from previous work installing new gas service.
BUSES and TRASH trucks will be able to get through with possibly some slight delays. The work is expected to be completed by the end of Friday.
Location
PINNEY ROAD
GRASSHOPPER ROAD
HUNTINGDON VALLEY, PA 19006